Setting Evatic Admin:Your administrator can decide if 2 numbers should be shown behind each node (folder). The first one will contain planned tasks (not assigned), the second one will contain assigned tasks. E.g. the folder for technician 'Peter Smith': 2 tasks are planned, and 4 tasks are assigned. This example will be shown as follow in the tree structure: (2)(4) (see Setting Company XXX/PROJECT/NODE ADD_NOT_ASSIGNED_NUM)
If planned task should not be shown, then the setting COMPANY_XXX/PROJECT / NODE_ADD_TOTAL_NUM can be used. The first folder will then show a summarize of all projects in the folder and its connected sub-folders E.g. (10)(4) . If the node has now connected sub-folders, the number will be the same, e.g. (4)(4).